Annual report pursuant to Section 13 and 15(d)

Oil And Natural Gas Properties And Equipment

v3.6.0.2
Oil And Natural Gas Properties And Equipment
12 Months Ended
Dec. 31, 2016
Oil And Natural Gas Properties And Equipment [Abstract]  
Oil And Natural Gas Properties And Equipment

6. OIL AND NATURAL GAS PROPERTIES AND EQUIPMENT

Proved Properties

We review our oil and natural gas producing properties for impairment quarterly or whenever events or changes in circumstances indicate that the carrying amount of such properties may not be recoverable. When an oil and natural gas property’s undiscounted estimated future net cash flows are not sufficient to recover its carrying amount, an impairment charge is recorded to reduce the carrying amount of the asset to its fair value. The fair value of the asset is measured using a discounted cash flow model relying primarily on Level 3 inputs into the undiscounted future net cash flows. The undiscounted estimated future net cash flows used in our impairment evaluations at each quarter end are based upon the most recently prepared independent reserve engineers’ report adjusted to use forecasted prices from the forward strip price curves near each quarter end and adjusted as necessary for drilling and production results.

During 2016, our negative price differential to Brent narrowed and we incurred no significant capital spending. We considered these and other factors and determined that there were no events or circumstances triggering an impairment evaluation for most of our fields, with the exception of the Avouma field in the Etame Marine block offshore Gabon. Recently, at the Avouma field, the electrical submersible pumps (“ESPs”) in the South Tchibala 2-H well and the Avouma 2-H well failed, and these wells were temporarily shutin. After utilizing a hydraulic workover unit to replace the failed ESP systems, the South Tchibala 2-H and the Avouma 2-H wells resumed production in December 2016 and January 2017, respectively. The reserves used in our impairment evaluation of the Avouma field prior to the fourth quarter of 2016 were revised to reflect the impact of this lost production for several months and the impact of the forward price curve. The undiscounted future net cash flows for the Avouma field were in excess of the field’s carrying value. As a result, no impairment was required for the Avouma field, or any of our other fields in Gabon, for 2016.

Prior to selling our interests in the two wells in North Texas for $830,000, we performed an impairment test and determined that a $0.1 million impairment was required in the third quarter of 2016.

Declining forecasted oil prices in 2015 caused us to perform impairment reviews of our proved properties in each quarter of 2015 for all fields in the Etame Marin block offshore Gabon and the Hefley field in North Texas. For the Etame Marin fields, we recorded an aggregate impairment charge of $78.1 million for 2015, reducing the aggregate carrying value of these fields to an aggregate fair value of $12.7 million. For the U.S. fields, we recorded an impairment charge of $3.2 million for 2015 reducing the aggregate carrying value of the field to $1.2 million.

The substantial decline in oil prices that began in the third quarter of 2014, triggered an impairment review at December 2014. Accordingly, impairment testing was performed using the year end 2014 independently prepared reserve report. The measurement of these assets at fair value was calculated using a discounted cash flow model based on estimates of future revenues and costs associated with the fields of the Etame Marin block. Significant Level 3 assumptions associated with the calculation of discounted cash flows used in the impairment analysis include our estimate of future crude oil and natural gas prices, production costs, and anticipated production of proved reserves, appropriate risk-adjusted discount rates and other relevant data. For crude oil, estimates were based on NYMEX Brent Ice Intermediate prices, adjusted for quality, transportation fees, and market differential. An aggregate impairment loss of $98.3 million was recorded in 2014 to write down Etame, Ebouri, Southeast Etame and North Tchibala fields to their fair value of $41.1 million. 

Undeveloped Leasehold Costs

In September 2011, we acquired an interest in the Middle Bakken and deeper formations in the East Poplar unit and the Northwest Poplar field in Roosevelt County, Montana. Exploratory drilling required by terms of the acquisition was unsuccessful. Due to the sustained low oil prices and forward oil prices, we charged the full $1.2 million undeveloped leasehold to exploration expense in 2015.

Capitalized Exploratory Well Costs

The following table provides information about exploratory well costs capitalized pending the determination of proved reserves as of December 31, 2016, 2015 and 2014.  





 

 

 

 

 

 

 

 

 



 

 

 

 

 

 

 

 

 



 

 

 

 

 

 

 

 

 



 

December 31,

(in thousands, except number of projects)

 

 

2016

 

 

2015

 

 

2014

Exploratory well costs capitalized for less than one year

 

$

 -

 

$

 -

 

$

 -

Exploratory well costs capitalized for greater than one year

 

 

 -

 

 

 -

 

 

8,900 

Total capitalized exploratory well costs

 

$

 -

 

$

 -

 

$

8,900 

Number of projects capitalized for greater than a year

 

 

 -

 

 

 -

 

 

At December 31, 2014, the drilling costs of the N’Gongui No. 2 discovery that was drilled in the third and fourth quarters of 2012 in the Mutamba Iroru block onshore Gabon were capitalized pending the determination of proved reserves.

Since this discovery, we have performed quarterly evaluations of the capitalized exploratory well costs for the N’Gongui No. 2 discovery to determine whether sufficient progress had been made towards development, as well as the economic and operational viability of the project. The evaluation of economic viability takes into account a number of factors, including alternative development scenarios, estimated reserves, projected drilling and development costs and projected oil price data. As a result of lower projected oil price data at September 30, 2015, the results from the economic modeling indicated that the costs for this well did not continue to meet the criteria for suspended well costs. Accordingly, all capitalized costs related to the project, including capitalized exploratory well costs were charged to exploration expense in the third quarter of 2015.

Capitalized Equipment Inventory

Capitalized equipment inventory in Gabon related to Mutamba was written off in 2015 because further drilling in the prospect is uneconomic, while equipment inventory related to the Etame Marin block was reduced in value due to obsolescence of some items.